Get in touch 07891 410 960
Bathrooms • Crowthorne, Berkshire

Bathroom Installation in Crowthorne

20+ years of bathroom projects locally — local team covering RG45 and surrounding areas.

Crowthorne bathroom projects split between careful period work in the Victorian villas around the village and considered modern installs in the larger Pinewood and Edgcumbe Park homes. Both deserve proper design time, and we'll spend longer at the quote stage on Crowthorne than for a quick estate refit because the layouts and material choices matter more here.

Why this matters in Crowthorne

Wellington College area period bathrooms often have original wood floors with significant slope — anything from 10mm to 30mm across the room. Tiling onto a sloped floor properly needs self-levelling compound first (or a sloped floor build-up), and skipping this step is the single most common reason period-property bathroom tiles fail within 5-7 years.

How we deliver bathroom installation in Crowthorne

  1. 1

    Design visit

    On-site design visit in Crowthorne — measurements, layout sketch, fittings discussion, realistic budget conversation.

  2. 2

    Fixed-price quote

    Itemised quote covering rip-out, plumbing, electrics, tiling and decoration. No surprise extras in week two.

  3. 3

    One team start to finish

    Same crew through rip-out, first fix, tiling, second fix and decoration. No coordinating subcontractors.

  4. 4

    Snag and sign off

    Joint walkthrough at the end across Crowthorne projects, any snags fixed before the final invoice.

Bathrooms in Crowthorne — common questions

My Crowthorne period bathroom floor isn't level — what's the right way to deal with it?+

Self-levelling latex screed before tiling (or floor build-up with timber and ply for larger slopes). Skipping this and tiling onto a sloped floor causes grout failure and cracked tiles within 5-7 years. Adds £200-£400 to the project and is essential — we'd never quote without it on a period property.

How long does a bathroom refurb take in Crowthorne?+

Typical family bathroom refurb in Crowthorne is 8-12 working days on site, one team start to finish. Larger projects (knock-throughs, full layout changes, master en-suites with freestanding baths) run 12-18 working days. We give a precise timeline at the quote stage.

Do you handle tiling, electrics and decoration on Crowthorne bathrooms?+

Yes — single team covering plumbing, gas, electrics (Part P), tiling, plastering and decoration across Crowthorne and Wellington College, Pinewood, Edgcumbe Park. You deal with one company, one quote, one invoice. No coordinating subcontractors yourself.

Bathrooms in nearby towns

In summary

Period-property and modern bathroom refurbishments across Crowthorne, Pinewood and Edgcumbe Park. Sub-floor levelling, careful material selection, considered design time. Fixed-price quotes, one team start to finish.

WhatsApp