Get in touch 07891 410 960
Bathrooms • Farnborough, Hampshire

Bathroom Installation in Farnborough

20+ years of bathroom projects locally — local team covering GU14 and surrounding areas.

We fit a lot of family bathrooms in Farnborough — particularly the modest-size, slightly awkward layouts that are typical of Cove, Pyestock and South Farnborough 1960s-80s semis. Most projects run 8-12 working days on site with a single team handling rip-out, plumbing, electrics, tiling and making good, rather than chains of subcontractors.

Why this matters in Farnborough

Farnborough family-home bathrooms often have a long, narrow shape with the door at one end and the window at the other — a layout that wastes space if you fit a standard 1700mm bath. We usually recommend a P-shaped shower bath or a wet-room conversion to recover the lost end of the room, depending on whether you need a bath at all.

How we deliver bathroom installation in Farnborough

  1. 1

    Design visit

    On-site design visit in Farnborough — measurements, layout sketch, fittings discussion, realistic budget conversation.

  2. 2

    Fixed-price quote

    Itemised quote covering rip-out, plumbing, electrics, tiling and decoration. No surprise extras in week two.

  3. 3

    One team start to finish

    Same crew through rip-out, first fix, tiling, second fix and decoration. No coordinating subcontractors.

  4. 4

    Snag and sign off

    Joint walkthrough at the end across Farnborough projects, any snags fixed before the final invoice.

Bathrooms in Farnborough — common questions

Can you fit a Farnborough bathroom while we're still living in the house?+

Yes — we cover the floor with dust sheets, contain the room with plastic, vacuum at end of every day, and work in a way that lets you use the rest of the house normally. Most family bathrooms are done in 8-12 working days, single team start to finish, so disruption stays predictable.

How long does a bathroom refurb take in Farnborough?+

Typical family bathroom refurb in Farnborough is 8-12 working days on site, one team start to finish. Larger projects (knock-throughs, full layout changes, master en-suites with freestanding baths) run 12-18 working days. We give a precise timeline at the quote stage.

Do you handle tiling, electrics and decoration on Farnborough bathrooms?+

Yes — single team covering plumbing, gas, electrics (Part P), tiling, plastering and decoration across Farnborough and Cove, Hawley, North Camp. You deal with one company, one quote, one invoice. No coordinating subcontractors yourself.

Bathrooms in nearby towns

In summary

Family bathroom installs and refurbishments across Farnborough, single team start to finish, typically 8-12 working days on site. P-shaped baths, wet rooms and full refurbs to suit Cove and South Farnborough layouts. Fixed-price quotes.

WhatsApp