Get in touch 07891 410 960
Bathrooms • Fleet, Hampshire

Bathroom Installation in Fleet

20+ years of bathroom projects locally — local team covering GU51, GU52 and surrounding areas.

Fleet's newer-build family homes often have bathrooms and en-suites built to budget rather than spec, with developer-grade fittings starting to look tired and underperform after 10-15 years. A full refurb here is usually a clean job — original layouts work well, modern fittings drop in cleanly, and most projects are done in 8-10 working days.

Why this matters in Fleet

Elvetham Heath and Zebon Copse developer en-suites frequently came with mixer showers on low flow rates that have always been disappointing. Adding a small pumped shower (Stuart Turner or Salamander) during a refurb finally delivers the shower pressure the room always deserved — usually around £400 extra including pump and wiring.

How we deliver bathroom installation in Fleet

  1. 1

    Design visit

    On-site design visit in Fleet — measurements, layout sketch, fittings discussion, realistic budget conversation.

  2. 2

    Fixed-price quote

    Itemised quote covering rip-out, plumbing, electrics, tiling and decoration. No surprise extras in week two.

  3. 3

    One team start to finish

    Same crew through rip-out, first fix, tiling, second fix and decoration. No coordinating subcontractors.

  4. 4

    Snag and sign off

    Joint walkthrough at the end across Fleet projects, any snags fixed before the final invoice.

Bathrooms in Fleet — common questions

Can you fix the weak shower in our Fleet new-build en-suite during a refurb?+

Yes — usually with a small dedicated shower pump (Salamander or Stuart Turner) wired in during the refurb. Adds around £400 to the project and transforms the shower from disappointing to genuinely good. Often the single biggest comfort upgrade in a Fleet new-build bathroom refurb.

How long does a bathroom refurb take in Fleet?+

Typical family bathroom refurb in Fleet is 8-12 working days on site, one team start to finish. Larger projects (knock-throughs, full layout changes, master en-suites with freestanding baths) run 12-18 working days. We give a precise timeline at the quote stage.

Do you handle tiling, electrics and decoration on Fleet bathrooms?+

Yes — single team covering plumbing, gas, electrics (Part P), tiling, plastering and decoration across Fleet and Church Crookham, Crookham Village, Ancells Farm. You deal with one company, one quote, one invoice. No coordinating subcontractors yourself.

Bathrooms in nearby towns

In summary

Bathroom and en-suite refurbishments across Fleet, Church Crookham and Elvetham Heath. Shower pump upgrades, full re-tile, modern brassware. One team start to finish, typically 8-10 working days, fixed-price quotes.

WhatsApp