Get in touch 07891 410 960
Bathrooms • Yateley, Hampshire

Bathroom Installation in Yateley

20+ years of bathroom projects locally — local team covering GU46 and surrounding areas.

Yateley bathroom work is most often family bathrooms in estate homes around Darby Green — tired 90s suites being upgraded to modern equivalents — and the occasional bigger project in the village proper. We handle both with the same approach: single team, fixed price, no surprises in week two.

Why this matters in Yateley

Yateley 90s estate bathrooms frequently came with bath-shower combos that are now both visually dated and impractical. The realistic upgrade for most families is a separate walk-in shower plus a shorter freestanding bath — usually fits in the same footprint and feels twice the size.

How we deliver bathroom installation in Yateley

  1. 1

    Design visit

    On-site design visit in Yateley — measurements, layout sketch, fittings discussion, realistic budget conversation.

  2. 2

    Fixed-price quote

    Itemised quote covering rip-out, plumbing, electrics, tiling and decoration. No surprise extras in week two.

  3. 3

    One team start to finish

    Same crew through rip-out, first fix, tiling, second fix and decoration. No coordinating subcontractors.

  4. 4

    Snag and sign off

    Joint walkthrough at the end across Yateley projects, any snags fixed before the final invoice.

Bathrooms in Yateley — common questions

Can we have a separate shower and bath in a typical Yateley bathroom?+

Usually yes — most 90s Yateley estate bathrooms have enough floor area for an 1500mm shorter bath plus a 900x900 shower enclosure side by side. We sketch the layout on the survey so you can see it works before committing. Costs around £600-£900 more than a like-for-like bath-shower-combo refit.

How long does a bathroom refurb take in Yateley?+

Typical family bathroom refurb in Yateley is 8-12 working days on site, one team start to finish. Larger projects (knock-throughs, full layout changes, master en-suites with freestanding baths) run 12-18 working days. We give a precise timeline at the quote stage.

Do you handle tiling, electrics and decoration on Yateley bathrooms?+

Yes — single team covering plumbing, gas, electrics (Part P), tiling, plastering and decoration across Yateley and Darby Green, Frogmore, Eversley. You deal with one company, one quote, one invoice. No coordinating subcontractors yourself.

Bathrooms in nearby towns

In summary

Family bathroom and en-suite refurbishments across Yateley, Darby Green and Eversley, with realistic layout options shown at survey before committing. One team start to finish, 8-12 working days typical, fixed-price quotes.

WhatsApp