When people ask how long a boiler takes to fit, they are usually trying to plan time off work or work out how long they will be without heating and hot water. The time on site depends mostly on what is changing. Replacing one boiler with the same type in the same place is a very different job from moving the boiler, removing a cylinder and converting the whole system.
A like-for-like combi swap is usually completed in one day, with the old boiler removed. Everything else in this guide explains why other jobs take longer, so you can read your quote and know what to expect.
Typical job types and what they involve
These are general descriptions of the work. Your survey and quote will set out the plan for your home.
| Job | What changes | Relative length |
|---|---|---|
| Combi to combi, same place | Boiler, controls, flue and system clean | Usually one day |
| Combi swap with a new position | Also gas, water, condensate and flue routes | Longer than a straight swap |
| System or regular boiler replaced like for like | Boiler and associated controls; cylinder kept | Often similar to a swap, sometimes longer |
| Conversion to a combi | Cylinder and loft tanks removed, pipework altered | Typically more than one day |
| New system or major pipework changes | Boiler, radiators and pipe routes | Several days |
What happens during a one-day swap
The day usually starts with protecting floors and the work area, isolating gas, water and electricity to the boiler, and draining the heating system. The old boiler is taken off the wall and removed. Pipework is adapted to the new appliance's connections, and a new flue is fitted. Most installers also clean the system, add inhibitor and fit a magnetic filter so the new boiler is protected from old debris.
Then the boiler is filled, vented and commissioned: the engineer checks gas pressure, combustion readings and that heating and hot water work properly. The paperwork, including the Benchmark checklist and Building Regulations notification, is completed and the controls are explained. Our guide to boiler installation day by day goes through this in more detail.
Things that commonly add time
- Moving the boiler to a new room or wall, which means new gas, water, condensate and flue routes.
- Upgrading the gas supply pipe where the existing one is too small for the new boiler.
- Removing a hot water cylinder and loft tanks during a conversion to a combi.
- A heavily sludged system that needs a more thorough clean before the new boiler goes on.
- Difficult access, such as a boiler in a loft or a flue that needs work at height.
- Additional work in the same visit, such as new radiators or upgraded controls.
Will I be without heating and hot water?
For most of the installation day you will be without both, because the system has to be drained and the gas isolated. On a one-day swap, heating and hot water are normally back by the end of the day once commissioning is complete. On longer jobs, the installer can usually tell you in advance which days will be most disruptive, and some conversions are planned so that hot water is restored at the end of each day where possible.
Cold weather does not stop installations, but it is worth having a plan for a day without heating: an electric heater for a young child's room, for example. If you are flexible, our guide to the best time of year to replace a boiler covers the pros and cons of different seasons.
How to help the job run to time
- 1
Clear the area
Empty the boiler cupboard and any cupboard holding a cylinder that is being removed, and clear a path for the old units.
- 2
Tell the installer about access
Parking, loft hatches, pets and anything fragile near the work area all affect the day.
- 3
Agree the plan at the survey
Confirm the boiler position, flue route and controls in advance so there are no decisions to make on the day.
- 4
Be around at the start and finish
You will want to agree the work at the beginning and be shown the controls at the end.
The best predictor of how long your installation will take is what your survey says is changing. Ask your installer to walk you through the plan, and the timescale usually explains itself.

