New floors and extensions
The easiest time to fit underfloor heating is when a floor is being laid anyway. In an extension or a new screeded floor, insulation goes down first, then the pipe circuits are clipped or tracked in place and the screed is poured over them. The screed holds and spreads the heat. Because the pipework is buried, it is pressure-tested before the floor goes down. We work with your builder on timing, so the pipes are laid at the right stage and the floor layers know what is beneath them.

