Underfloor heating is easy to plan in a new extension where the floor is being built from scratch. In an existing room, the question becomes how much floor height you can spare and what is already underneath.
There are several ways to add wet underfloor heating to an existing home. This guide explains the main ones, the trade-offs in height and warm-up time, and what a survey looks at before recommending a method.
The main methods compared
| Method | Best for | Height | Response |
|---|---|---|---|
| Traditional screed | Floors being dug up or rebuilt | Most build-up | Slow but very even |
| Low-profile overlay | Solid floors that cannot be lowered | Low build-up | Faster |
| Between joists | Suspended timber floors with access from above or below | Little or none | Moderate |
| On top of joists | Timber floors being re-boarded | Some build-up | Moderate to fast |
Heights depend on the system, insulation and finish, so the survey measures your floor rather than relying on brochure figures.
Height: the first question
Any system that sits on top of the existing floor raises it. That affects door thresholds, kitchen units, skirting and the step into adjoining rooms. Low-profile overlay systems are designed to keep this increase small, but even a modest rise needs planning around doors and appliances.
If the floor is being taken up anyway, for example during a kitchen renovation, digging out and laying insulation and screed can give the best long-term result. In timber-floored rooms, laying pipes between the joists can avoid any height change at all.
Insulation makes or breaks it
- Heat should go up into the room, not down into the ground or the room below.
- Overlay systems usually include an insulation board under the pipes.
- Between-joist systems need insulation below the pipes and spreader plates above.
- Poorly insulated floors warm up slowly and cost more to run.
Floor finishes
Tile and stone
Conduct heat very well and are a natural match for underfloor heating.
- Fast heat transfer
Engineered wood and laminate
Work with underfloor heating when the manufacturer approves it and the floor temperature is limited.
- Check the finish's limits
Carpet
Possible with a low tog underlay, but thick carpet and underlay slow heat transfer.
- Choose low tog products
What a retrofit involves
- 1
Survey
Check the floor construction, available height, heat loss, boiler and where the manifold can go.
- 2
Prepare
Clear the room, level the floor where needed and lay insulation.
- 3
Lay the pipes
Loops are laid in the chosen system and pressure-tested.
- 4
Finish the floor
Screed, boards or the overlay surface go down, followed by the final finish.
- 5
Connect and commission
The manifold is connected to the heating system, balanced and set up with thermostats.
Rooms that suit a retrofit best
Kitchens, dining areas and hallways with hard floors are often the easiest wins, because tile and stone transfer heat well and these rooms are frequently refloored anyway. Ground floor rooms with solid floors can take overlay systems, while upstairs bedrooms with timber floors suit joist-based methods. Rooms with deep carpet, very limited height at doors or complex fitted furniture take more thought. The survey looks at each room on its own merits, and it is common to fit underfloor heating in one or two rooms while keeping radiators elsewhere.
Running costs and boiler compatibility
Wet underfloor heating runs from the boiler, so the running cost depends on the heat the rooms need and how efficiently the boiler works. Because floors run at lower water temperatures than radiators, condensing boilers can operate in their more efficient range for more of the time, especially in systems that are largely underfloor heating.
In a retrofit, the boiler capacity, manifold position and controls all need checking. Adding a large heated floor to a system that is already stretched may need a boiler review. The survey looks at this before recommending a method, so the new floor does not leave other rooms short of heat.
Disruption to expect
A screed retrofit means the room is out of use while the floor is prepared and the screed cures. Overlay systems are quicker and often let the room be back in use sooner. Timber floor methods depend on access from above or below. Ask for a clear outline of the stages so you can plan around them.
Most existing floors can take underfloor heating in one form or another. The right method is the one that respects your floor height, your finish and the rest of the project.