A split air conditioning installation connects its indoor and outdoor units with a carefully arranged set of services. Two refrigerant pipes form the sealed circuit, a condensate pipe removes water produced at the indoor unit, and electrical connections provide power and communication. The visible covering used to tidy these routes is usually called trunking.
Good route planning balances appearance with technical limits. A shorter, direct route may be easier to conceal, while a longer route can offer a better unit position but require more materials and access. Every bend, wall penetration and drainage point should be agreed before installation day rather than discovered after the unit is fixed.

What runs between the two units
The pair of refrigerant lines are different sizes and carry refrigerant between the indoor coil and outdoor unit in a sealed loop. They are insulated to control heat transfer and reduce the risk of condensation on the colder line. The insulation and joints must remain continuous and protected where the route is exposed outdoors.
The condensate line is separate. In cooling mode, moisture from room air collects on the indoor coil and drains into this pipe. A gravity route needs a continuous fall to a suitable discharge point. Where gravity is not practical, a correctly selected condensate pump may be included.
Electrical cables also follow the design for the chosen equipment. Their requirements are not interchangeable between models, and the installation may need a dedicated circuit or isolator as determined by the qualified installer.
Ways to conceal the services
| Route | Appearance | Practical considerations |
|---|---|---|
| Through the wall behind the indoor unit | Very little visible inside | Needs suitable unit and outdoor positions |
| Surface trunking indoors | Neat straight cover on the wall | Visible profile, corners and access must be planned |
| Trunking on an outside wall | Services grouped in a weather-resistant cover | Route, fixing and exposure affect the result |
| Within a floor or ceiling void | Mostly hidden | Access, fire stopping, drainage and future reach need thought |
| Built into construction work | Concealed within a planned building route | Best coordinated before walls and finishes are completed |
Why back-to-back is only one possible layout
A back-to-back arrangement places the outdoor unit on the other side of the wall from the indoor unit. The services pass almost directly between them, keeping the route short and often reducing visible trunking. It can be a neat answer where that wall also provides a suitable outdoor position.
It is not always available or desirable. The outdoor unit needs airflow, clearance, support and a location that considers noise and drainage. Indoors, the unit needs an effective air distribution pattern and sensible clearance. Moving one unit solely to shorten pipes can compromise those more important decisions.
Other routes run through a loft, down an outside wall or across a void. The equipment manufacturer specifies limits including maximum pipe length and height difference. A survey checks the proposed layout against those limits rather than assuming any distance can be accommodated.
What makes a pipe route look considered
- Straight runs and deliberate bends aligned with walls, corners and architectural features.
- Trunking sized for the insulated pipes, drainage and cables without crushing or tight forced bends.
- Continuous insulation and suitable weather protection on exposed sections.
- Wall holes sealed appropriately after the services are installed.
- A condensate route with the required fall and an agreed discharge location.
- Access where components may need inspection, without leaving unnecessary covers and joints on show.
Questions of access and future decoration
Concealed routes look clean but should not create an impossible maintenance situation. The installer should explain what is accessible and which parts are intended to remain sealed within the building fabric. Pipe routes through fire-separating construction also need appropriate reinstatement.
If redecoration is planned, agree the order of work. Surface trunking can sometimes be installed neatly before final decoration, while chasing or constructing hidden routes needs much earlier coordination. Nobody should cut structural elements or drill without checking for hidden services and suitable construction.
At handover, ask where the condensate discharges, how the outdoor unit is supported and which visible covers belong to the installation. Clear photographs of concealed routes can be useful for future building work.
How the route is settled at survey
- 1
Choose unit positions on performance
Assess airflow, room layout, outdoor clearance, support and noise before focusing on the shortest pipe run.
- 2
Walk the complete route
Identify walls, voids, bends, exterior sections and the final condensate discharge point.
- 3
Agree what will be visible
Confirm trunking locations, colours where available and any making good included in the written quote.
- 4
Check manufacturer limits
Match length, height difference and equipment connections to the exact proposed system.
Want to see the pipe route before you commit?
Our free in-home survey agrees unit positions, visible trunking and drainage before you receive a fixed-price written installation quote.
A neat installation starts with suitable units and a route designed around them; trunking then finishes the plan rather than hiding a lack of one.